protovis part 2: lines and labels

Changing Bar Size

That moved and resized the chart but we lost a bar. That's because we also need to change the bar size and the left property that creates the gap.

Change width to 15 then in the left property change the multiple from 25 to 20. Perfect. now we're ready to add a baseline rule.